Flange Fitting Station for Onshore and Offshore Wind Towers
September 1, 2020
PEMA Flange Fitting station (PEMA FF) is suitable for both onshore and offshore tower production. The solution is designed to simplify production and improve safety.
"The continuously growing size of wind turbines requires larger diameters and heavier weights in flanges and tower sections, which makes the handling of these components with overhead crane more challenging and requires special skills and tools from the crane operator," said a company spokesperson. "With PEMA FF station, flange fitting is possible without turning the shell, and thus cranes can be released to other tasks. Also, the amount of repairing is minimized since there is no need for lifting clamps."
"It is amazing how many different flange designs there are currently on the market. Pemamek has worked together with both onshore and offshore customers to make PEMA FF Station flexible for all different variations," explained Teemu Tolonen, Pemamek's Application Manager of Wind Energy.
With PEMA FF station, the production time for flange fitting and welding is reduced while the quality of fit-up only increases. The station can be integrated with PEMA Column&Boom, which enables welding to be done in the same place. "The integration significantly increases the easiness and efficiency of manufacturing, and it has been proven successful also in offshore wind tower foundation production," said the spokesperson.
"Our FF Station can handle tubular and conical shells, it has a wide range for different diameters and lengths of the shells and changeable tools to help to adjust the fit-up tool for different L- and T-type flanges," summarized Tolonen.
For more information contact:
Pemamek LLC
20333 State Highway 249, Suite 200
Houston, TX 77070
832-966-0294
info.us@pemamek.com
www.pemamek.com
< back